3 people want to...

finish renovating the kitchen


 

People doing this:

  • Brisbane
    2 entries
  • Kelowna

  • Entries

    Chickencat is a bit slack at this game

    17 August 2008 3 months ago

    WALL GONE!! Looks wicked.



    Chickencat is a bit slack at this game

    Splashbacks 3 months ago

    Done!

    One wall to remove, second fix electrical, some paint and finishing touches and it will be DONE!

    I can finally see the end. Thank GOD.



    Chickencat is a bit slack at this game

    Electricians 6 months ago

    Are really unreliable, but at least we’ve had first fix completed. splashbacks next.



    Chickencat is a bit slack at this game

    Little by little 7 months ago

    My partner put on some kickboards the other day so we have made some very small progress with this one but it is better than nothing. He is doing such a good job :)



    Chickencat is a bit slack at this game

    The story so far... 9 months ago

    We bought our place and moved in around September of 2006. The kitchen then consisted of a sink and a broken oven. So we ripped it all out and proceeded to DIY.

    ‘Cept we are crap at it.

    So, the kitchen stayed a hole for about 12 months before we finally got something to cook and clean in. Took another three months to put in the cupboards and get the benchtops.

    So now I am waiting for the electrician to come in and actually wire up my electricity (currently using extension cords – fun!), and for some splashbacks and a new ceiling and lights.

    I desperately hope that this will happen before the end of April. But I ain’t holding my breath!!



    checklist 9 months ago

    shelves up, moulding painted, kickbboards primed. it’s getting done bit by little bit.



    all the kitchen boxes are now unpacked 9 months ago

    After 2 and a bit years of living here, finally all the kitchen stuff is put away where its supposed to be! Yay!



    getting there... 10 months ago

    I don’t know why we’ve dragged this out so long. There are realy very few things left to take care of before we call the kitchen complete.

    The big lingerer was designing and constructing the open shelving for above the sideboard. I’m happy to report that the second coat of paint is on them as of this morning and we should be able to fasten them to the wall in a day or two.

    After that here’s what’s still left:

    - prime, paint and attach kickboards under lower cupboards * done
    - prime, paint and put up cupboard above fridge
    - add grout to tile in pantry
    - add grout between wood trim and counter tiles *done
    - fill and paint decorative moulding above arches *done



    bit closer 1 year ago

    We are started to get closer to finishing this one off. I painted the bench tops, they look fantastic! I also found a really cool plastic panelling for our splashback which looks like lovely shiny aluminium treadplate. It is going to be a bit tricky working out how to get it to adhere to the wall. We’ll work it out!



    Well we have started 2 years ago

    Not too much more to do.

    I have painted the cupboards, replaced the taps, painted the walls.

    Still need to…

    1. Replace the oven
    2. Install splashback
    3. Tile Floors




     

    I want to: